Inspection of Water Supply System of Building

   

First-time Application

Type of procedureFirst-time Application
Documents to be submitted1.Appllication form 008-SCEU(Available at all public services centres of the Civic and Municipal Affairs Bureau (IACM) free of charge or downloadable at IACM's website);
2.Legible photocopy of the description memorandum showing the gross floor aera of the individual flat by precentage;
3.Legible photocopy of the location plan of the building;
4.Legible photocopy of the floor plan and elevation plan of the water supply system;
5.Legible photocopy of the Construction Work License issued by the Land, Public Works and Transport Bureau.
Note: For individual application, the reception staff shall verify their signature or their notarized copy. If the application is a company, the respective signature or copy must be notarized by the Public Notary Office.
Documents to be presentedNot Applicable
Important notes1.The application must be the property owner;
2.Inspection be conducted after payment of respective fee.
Target groupNew building
Application feeEach household or each individual flat: MOP$150.00
Form feeNot Applicable
Stamp dutyEach household or each individual flat: MOP$15.00 (10% of application fee)
Security depositNot Applicable
Fees, Charges and Prices ListNot Applicable
Unit in-chargeDivision of Buildings and Construction
Location for processing the procedure1.Integrated Services Centre of IACM: Avenida da Praia Grande, no.762-804, China Plaza Building, 2/F,Macau.
2.Northern District Public Services Centre:Rua Nora da Areia Preta, no.52,Service Centre of Macao SAR,G/F,Macau.
3.Islands District Public Services Centre:Rua da Ponte Negra,Bairro Social da Taipa,no.75K,Taipa.
4.Central District Public Services Centre: Rotunda de Carlos da Maia, nos.5 e 7, Complexo da Rotunda de Carlos da Maia, 3/F.
Office hoursMondays to Fridays 9:00 am - 6:00 pm
Note: no lunch break
Saturday,Sunday and Public Holiday is closed
Tel / FaxCivic Service Hotline: 2833 7676
Processing time18 working days